Investment project: Small ships production development
A. Project Opportunity Description:
A1. Project Name:
Small ships production development
a. Short name:
Small Ships production Development on the basis of the Republican Unitary Enterprise «Gomel Shipbuilding and Ship-repairing plant»
b. Full name:
Small Ships production Development on the basis of the Republican Unitary Enterprise «Gomel Shipbuilding and Ship-repairing plant»
c. Summary description:
Creation of production base and development of production of small ship of various kind made of steel, overall dimension (3.2 m width, 8-20 m length, draught up to 0.5 m)
Stages of the project: - Market research to determine the level of demand for products; - Development of design and technological documentation (development of 3-4 types of enclosures with the possibility of completion in accordance with the wishes of the customer); - Purchase of new equipment and modernization of existing production capacity at the plant; - Direct production and maintenance products; It is planned to release as a fully-equipped vessels for various purposes, and non-equipped buildings with the possibility of equipping the forces of the customer. Project Benefits: - Lack of competition from other enterprises of the Republic of Belarus; - Relatively low cost of final product; - The possibility of construction of vessels of various modifications on the basis of typical buildings
a. Project cost (mln USD):
3.9
A5. Background / history / overall programme / related or similar projects:
Currently, the company specializes in manufacturing steel from steel for various purposes, but was created for shipbuilding and ship repair. At the present moment in Belarus there are no producers of ships of a similar level in the presence of demand due to the development of water tourism.
A6. Environmental impact summary:
Planned environmental protection measures during the project
A7. Possible obstacles/ problems/ risk assessment:
Non
A8. Term of realization / term of recoupment:
1 / 7
A9. Project’s branch:
Shipbuilding
B. Capital Cost Items (additional requirements for project):
B1. Project physical components
B2. Capital cost (mln USD)
Development of design and technological documentation, Purchase equipment needed
3.9
Total:
3.9
B3. Sub-projects by location
B4. Project cost (mln USD)
C. Capital Resources Available from Sponsors/ Proposers:
C1. Resources 'in kind', grants, investments, equity / ownership, etc.
C2. Amount (mln USD)
D. Required Financial Assistance:
D1. Financing gaps, type of financial assistance required:
D2. Sources of finance
D3. Type of investment
D4. Amount (mln USD)
Foreign investments
Direct investments, joint venture
3.9
D5. Financial/ International Institution Name:
E. Demand (users) and revenues:
E1. Type of users/ markets, volumes, pricing, revenues, quantifiable benefits/ savings: